Boiler Replacement

Two large industrial boilers with open access panels, revealing internal components. A view of a boiler room with four large boilers, pipes, and other equipment.
Upgrade from pneumatic (air) to HVAC digital controls A large industrial air compressor with the brand name Pureflow.

Air conditioning in the cafeteria

Classroom Reconstruction

 

Area Est. Start Est. End Current Pictures After/Renderings

Kitchen Reconstruction

May 2026 September 2026 A spacious school cafeteria with blue walls, tables, and benches, and students gathered in the room.
Cafeteria Finishes May 2026 September 2026 An overhead view of a building's floor plan, featuring a large dining area with tables and chairs, a kitchen, and other rooms.
Classroom Renovations: Sinks/ Cabinets/Toilet Rooms June 2026 August 2026

                                                                                                                                     

                                                                                                                                       

Area Est. Start Est. End Current Pictures After/Renderings
LED Lighting Upgrades (energy-savings)

 

  • Area Est. Start Est. End Current Pictures After/Renderings

    Boiler Replacement

    Two large industrial boilers with open access panels, revealing internal components. A view of a boiler room with four large boilers, pipes, and other equipment.
    Upgrade from pneumatic (air) to HVAC digital controls A large industrial air compressor with the brand name Pureflow.

    Air conditioning in the cafeteria

    Classroom Reconstruction

     

  • Area Est. Start Est. End Current Pictures After/Renderings

    Kitchen Reconstruction

    May 2026 September 2026 A spacious school cafeteria with blue walls, tables, and benches, and students gathered in the room.
    Cafeteria Finishes May 2026 September 2026 An overhead view of a building's floor plan, featuring a large dining area with tables and chairs, a kitchen, and other rooms.
    Classroom Renovations: Sinks/ Cabinets/Toilet Rooms June 2026 August 2026

                                                                                                                                         

                                                                                                                                           

  • Area Est. Start Est. End Current Pictures After/Renderings
    LED Lighting Upgrades (energy-savings)