Upgrade from pneumatic (air) to HVAC digital controls

Air conditioning in band room
Roof reconstruction
Provide ventilation in corridors
Perimeter drain and foundation waterproofing
Replace sidewalks along new drain
Modernize and repair elevator

 

Area Est. Start Est. End Current Pictures After/Renderings
Firelane, Retaining Wall and Curbing June 2025 August 2025 OMS Retaining Wall - CIP Work
Gymnasium - Entrance, Lobby, Lavatories and Folding Partition June 2026 August 2026 OMS gym entry CIP work
LGI Upgrades June 2026 August 2026
Combine Classrooms (Historical Library) June 2026 August 2026
Roof Reconstruction June 2026 August 2026

     

Area Est. Start Est. End Current Pictures After/Renderings

New Fiber Optic Lines Boiler Replacements (energy-savings)

Brick Re-pointing

 

  • Area Est. Start Est. End Current Pictures  After/Renderings

    Upgrade from pneumatic (air) to HVAC digital controls

    Air conditioning in band room
    Roof reconstruction
    Provide ventilation in corridors
    Perimeter drain and foundation waterproofing
    Replace sidewalks along new drain
    Modernize and repair elevator

     

  • Area Est. Start Est. End Current Pictures After/Renderings
    Firelane, Retaining Wall and Curbing June 2025 August 2025 OMS Retaining Wall - CIP Work
    Gymnasium - Entrance, Lobby, Lavatories and Folding Partition June 2026 August 2026 OMS gym entry CIP work
    LGI Upgrades June 2026 August 2026
    Combine Classrooms (Historical Library) June 2026 August 2026
    Roof Reconstruction June 2026 August 2026

         

  • Area Est. Start Est. End Current Pictures After/Renderings

    New Fiber Optic Lines Boiler Replacements (energy-savings)

    Brick Re-pointing