Skip to main content
District

2021 Capital Improvement Project

Capital Improvement Project 2021

A

Ginther Elementary School

• Boiler replacement

• Upgrade from pneumatic (air) to HVAC digital controls

• Air conditioning in the cafeteria

• Classroom reconstruction

Barclay Elementary School

• Improve heating and ventilation

• HVAC digital controls

• Air conditioning in the cafeteria

Hill Elementary School

• Boiler replacement

• Upgrade from pneumatic (air) to HVAC digital controls

• Air conditioning in the band room and nurses office

• Provide ventilation in corridors

• LED replacement at existing light poles

Oliver Middle School

• Upgrade from pneumatic (air) to HVAC digital controls

• Air conditioning in band room

• Roof reconstruction

• Provide ventilation in corridors

• Perimeter drain and foundation waterproofing

• Replace sidewalks along new drain

• Modernize and repair elevator

Brockport High School

• Repair exterior concrete columns and sills

• Upgrade from pneumatic (air) to HVAC digital controls

• Roof reconstruction

• Pool repairs (drains/shell)

• Pool shower fixture replacement

• Potable water piping replacement

• Modernize and repair elevator

• Fire alarm panel

2021 Capital Improvement Project Brochure