Oliver Middle School
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
Upgrade from pneumatic (air) to HVAC digital controls |
||||
Air conditioning in band room | ||||
Roof reconstruction | ||||
Provide ventilation in corridors | ||||
Perimeter drain and foundation waterproofing | ||||
Replace sidewalks along new drain | ||||
Modernize and repair elevator |
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
Firelane, Retaining Wall and Curbing | June 2025 | August 2025 | ![]() |
|
Gymnasium - Entrance, Lobby, Lavatories and Folding Partition | June 2026 | August 2026 | ![]() |
|
LGI Upgrades | June 2026 | August 2026 | ||
Combine Classrooms (Historical Library) | June 2026 | August 2026 | ||
Roof Reconstruction | June 2026 | August 2026 |
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
New Fiber Optic Lines Boiler Replacements (energy-savings) |
||||
Brick Re-pointing |
-
Area Est. Start Est. End Current Pictures After/Renderings Upgrade from pneumatic (air) to HVAC digital controls
Air conditioning in band room Roof reconstruction Provide ventilation in corridors Perimeter drain and foundation waterproofing Replace sidewalks along new drain Modernize and repair elevator -
Area Est. Start Est. End Current Pictures After/Renderings Firelane, Retaining Wall and Curbing June 2025 August 2025 Gymnasium - Entrance, Lobby, Lavatories and Folding Partition June 2026 August 2026 LGI Upgrades June 2026 August 2026 Combine Classrooms (Historical Library) June 2026 August 2026 Roof Reconstruction June 2026 August 2026 -
Area Est. Start Est. End Current Pictures After/Renderings New Fiber Optic Lines Boiler Replacements (energy-savings)
Brick Re-pointing